Monday, January 3, 2011

Time with KTM Komuter

1st day morning post:-

My first month in this new year resolution is boarding the komuter to work due to:
1. Save some money
2. Avoid stressful driving; since I'm becoming more like a road bully (^_^;)
3. Reduce my carbon foot print.
4. Avoid traffic summons

The calculation for reason no.1

Komuter
Komuter: RM 2.8 x 2 x 20 day = RM 112 (return trip)
Park @ KTM: RM 2 x 20 = RM 40
Fuel: RM 100
Total: RM 252.00

Drive
Fuel: RM 50 x 6 = RM 300 (Shah Alam - KL using Federal Highway + Sprint + LDP)
or RM 1.9 x 30L x 4 weeks = RM 228/1000 km (works return trip only)

Toll: RM 3.10 x 20 = RM 62.00
Federal Highway: RM 1.00 + RM 1.10 = RM 2.10
Sprint: RM 1.00
Total: RM 362.00/RM 290.00

The route I'm taking is from Shah Alam to Bank Negara with timetable 7.04 am or 7.19 am. Arrive at the KTM Station Sec. 19 approximately at 7am, boarding at 7.10 am and arrive at Bank Negara 8.05am.

Disturbing thing was, there still the "kiasu" attitude among the passenger. People coming out is stuck with the people crowd around the door. I'll do my best to make sure that I would not be one of them but sometimes its very frustrating when dealing with selfish peoples.

No comments:

Post a Comment